Thursday, 24 July 2014

David hard at work

David removed the cockpit sole, and the cabin sole, and then he cleaned all the bilges and painted them. He sanded down all the teak foot-rails around the deck, the tiller, and the cockpit combings.
He made new battery casings and fitted the new fuel tank casing that I made for the stern locker.
He also removed the side strapping in the saloon.

No comments:

Post a Comment